I. Background
Railway is the backbone of Hong Kong's passenger transport system. At present, there has ten railway lines in Hong Kong. They carry over 4.5 million passengers per day. The number is occupancy 38% of all daily transport passengers in Hong Kong.
Recently, the Government is reviewing and updating the Railway Development Strategy 2000. Two public engagements were conducted on July 2012 and May 2013. The first public engagement is focus on the major regional railway corridors, which include the Hong Kong-Shenzhen Western Express Line, Northern Link and Coastal Railway between Tuen Mun and Tsuen Wan. Moreover, seven local enhancements are suggested according to the findings of the public expectations and the statistic analysis in the second public engagement. They include North Island Line (NIL), Siu Sai Wan Line (SSWL), South Island Line (West) (SIL(W)), Tuen Mun South Extension, Hung Shui Kiu Station, Tunf Chung West Extension and Kwu Tung Station.
II. Information for Shatin Central Link (SCL)
A. Legislative Council
2. The construction cost is estimated to be $79.8 billion (MOD).
B. Highways Department:
B. Highways Department:
4. Cover Story - “Shatin to Central Link (SCL) Snapshots”, Highways Department Newsletter Issue 2/2012;
5. “The Shatin to Central Link and Kwun Tong Line Extension”, Highways Department Newsletter Issue 2/2008
6. XPS
C. MTRCL:
3. Shatin to Central Link Cross Harbour Section - Preliminary Design (Works in Victoria Harbour )
D. Environment and Heritage Preservation
1. The SCL will pass below some historic buildings, including three historical structures at the former Tai Hom Village (the old pillbox, the former Royal Airforce hangar and the stone house) which will have to be temporarily dismantled and relocated during the project’s construction, and archaeology site in Kai Tak.
E. News about XRL & SCL
XRL news 高鐵有關新聞 :-
XRL news 高鐵有關新聞 :-
. 2014.5.1 - 張炳良曾表驚訝 港鐵文件揭運房局早知高鐵延誤 - 蘋果日報
. 2014.4.28 - 高鐵文件涉謊報工程進度 - 東方日報
. 2014.4.16 - 工程師引用港鐵文件稱高鐵最終超支150 億 RTHK
. 2014.4.16 - 高鐵工程延誤怨天賴地 - 東方日報
. 2013.11.7 - 高鐵香港段國產列車 初次曝光 - 東方日報. 2014.4.28 - 高鐵文件涉謊報工程進度 - 東方日報
. 2014.4.16 - 工程師引用港鐵文件稱高鐵最終超支150 億 RTHK
. 2014.4.16 - 高鐵工程延誤怨天賴地 - 東方日報
. 2013.10.18 - 高鐵申索額75.6億佔合約17% - 東方日報
. 2013.9.3 - 高鐵徵地地署死撐符市值 - 東方日報
. 2013.8.27 - 高鐵工潮解決 抗爭十四小時 - 東方日報
. 2013.8.24 - 吊機打翻工作台兩人傷 - 東方日報
. 2013.8.3 - 高鐵隧道塌泥險葬工程師 - 東方日報;
SCL news 沙中線有關新聞 :-
. 2014.6.4 - 港鐵:沙中線至少延誤五個月 - 太陽報
. 2014.5.1 - 古井地盤交還港鐵復工 古諮成員稱不知 港鐵首認難改走線 - 明報
. 2014.5.1 - 沙中線再現宋井 工程受阻 - 東方日報
. 2014.3.31 - 沙中線奪命工業意外 港鐵暫停同類工程 - 東方日報
. 2014.3.13 - 沙中線採地底鑽掘 港鐵展首部港裝隧道鑽挖機 - 東方日報
. 2014.2.28 - 國際郵件中心將關閉及遷址 - 東方日報
. 2014.2.7 - 顯徑港鐵地盤 男子吊頸亡 - 東方日報
. 2014.1.16 - 沙中線會展站上蓋將預留建會議設施 - 東方日報
. 2013.10.28 - 馬頭圍兩爆水管陳茂波致歉 - 東方日報
. 2013.9.20 - 馬頭圍道爆塌樓驚魂 - 東方日報
. 2013.9.11 - 馬頭圍道爆水管東九龍大擠塞 - Yahoo
. 2013.7.13 - 沙中線工程惹地裂疑雲 - 東方日報;
F. Other information from Internet
7. “MTR orders trains and signalling for Shatin – Central Link” posted by IRJ
8. 電車公司啟德現代化電車(詳細計劃文件)
8. 電車公司啟德現代化電車(詳細計劃文件)
Annex A. List of contract awards from MTRCL’s websites (or MTRCL's Notice) as of April 2014
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
For reference:
XRL
Contracts
Awarded (as of December 2012)
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
G. Technical Information and Publications:
1. Design standards and manuals
b. NWDM by MTRCL
- BD37/01 Loads for Highway Bridges, Department of Transport , UK
d. Design Manual for Roads and Bridges, Department of Transport, Vol 2 - Design (Substructures and Special Structures) Materials
d. Design Manual for Roads and Bridges, Department of Transport, Vol 2 - Design (Substructures and Special Structures) Materials
2. Tunnelling
General:
a. Introduction of construction methods for tunneling works, including Drill-and-Blast method, Cut-and-Cover method, Tunnel Boring (TBM) or Immersed Tube Tunnel.
b. Technical Manual for Design and Construction of Road Tunnels - Civil Elements, US Department of Transportation
d. Application and Practice of GFRP Bars in the TBM Launching Shaft of Metro in China, 2007
TBM ground control:
e. Ground Control for Slurry TBM Tunnelling, GEO Report 249
Impact Assessment
f. Bibliography on Settlements Caused by Tunnelling to March 1996, GEO Report 51
g. Prediction of Building Damage due to Tunnelling
h. Some Critical Aspects Of Subaqueous Tunnelling - Muir Wood Lecture 2014
TBM Lining Design
f. Bibliography on Settlements Caused by Tunnelling to March 1996, GEO Report 51
g. Prediction of Building Damage due to Tunnelling
h. Some Critical Aspects Of Subaqueous Tunnelling - Muir Wood Lecture 2014
TBM Lining Design
i. Principles of Tunnel Lining Design by Dr. Morgan WW Yang 2002
j. Guidelines for Design of Shield Tunnel Lining - ITA-Working Group Research 1999
j. Guidelines for Design of Shield Tunnel Lining - ITA-Working Group Research 1999
3. Deep excavation
a. Large Diameter Diaphragm Wall Shaftsfrom Nicholson
b. Development of ERSS using Multi Cellular Structures – Recent Advances, from Bachy Soletanche
c. Tunnels and deep excavation by Jean Venables, ICE
4. Assessment of adjacent existing buildings
5. Blasting Control
a. Mines - Explosives and Blasting Control- Mines Division of CEDD
6. Publications from Society
7. Control of Excavation Works
b. A Brief on Excavation Permits, HyD
8. Accident review related to tunneling
a. National Transport Safety Board (2007) Highway Accident Report, Ceilling Collapse in the Interstate 90 Connector Tunne, Boston, Massachusetts
9. Risk Management
a. Risk Management – An Overall View of Geotechnical Baselines Report
9. Risk Management
a. Risk Management – An Overall View of Geotechnical Baselines Report