n DSD Technical Manuals
n Design of Stormwater Inlets (DSD PN no. 1/2003)
n Design Rainfall Depth for Temporary Works within the Dry Season (DSD PN no. 1/2004)
n Design Considerations for Open Channels Accommodating Supercritical Flows (DSD PN no. 3/2003)
n Chart for the Rapid Design of Channels (Fig 8.7 of Geotechnical Manual for Slopes)Proposed Works in Rivers and Steams
n Protection of natural streams/rivers from adverse impacts arising from construction works (ETBW TC(W) no. 5/2005)n Protection of Natural Rivers and Steams from Adverse Impacts Arising from Construction Works (DSD TC no. 2/2004)
n Guidelines on Environmental Considerations for River Channel Design (DSD PN no. 1/2005)
Drainage Impact Assessment (DIA)
n Process for Public Sector (WBTC no. 2/2006)
n Process for Private Sector Projects (DSD TC no. 3/95)
n Application of the Drainage Impact Assessment Process to Private Sector (DSD Advice no. 1)
n Temporary Flow Diversions and Temporary Works Affecting Capacity in Stormwater Drainage System (DSD TC no. 14/2000)
沒有留言:
張貼留言