A. Public Works Control
Reference: Development Bureau Technical Circulars (Works)
| PWDTC No. 13/78 | Compaction of New Fill Slopes |
| WBTC No. 13/90 | Ground Investigation |
| WBTC No. 10/91 | Monitoring and Maintenance of Horizontal Drains |
| WBTC No. 25/93 Appendix A | Control of Visual Impact of Slopes Appendix A - Practice Note on Control of Visual Impact of Slopes |
| WBTC No. 09/94 Appendix A | Restrictions on the Use of Hand-dug Caissons for foundations and Geotechnical Works Appendix A - Technical Guidance |
| WBTC No. 09/96 | Standards of Good Practice for Maintenance of Man_made Slopes and Retaining Walls |
| WBTC No. 03/97 Appendix 1 Appendix 2 Appendix 3 | Independent Checking of the Design, Erection, Use and Removal of Temporary Works Appendix 1 - Special Condition of Tender No. Appendix 2 - Special Condition of Contract Appendix 3 - Particular Specification |
| WBTC No. 13/99 | Geotechnical Manual for Slopes - Guidance on Interpretation and Updating Appendix A – Guidance on Interpretation of Geotechnical Manual For Slopes Table 1 - Recommended Minimum Factors of Safety for New Slopes for a Ten-year Return Period Rainfall |
| WBTC No. 26/99 | Maintenance of Man-made Slopes and Emergency Repair on Stability of Land |
| WBTC No. 09/2000 | Registration and Updating of the Catalogue of Slopes Appendix A - Feature Registration System Appendix B - Criteria for Feature Registration |
| WBTC No. 10/2000 | Display of Slope Registration Number on Site by Maintenance Departments |
| WBTC No. 14/2000 | Usage of Public Works Laboratories in Public Works Projects |
| WBTC No. 15/2000 | Funding Arrangement for Public Works Regional Laboratories Operating, Monitoring and Accounting Procedures |
| WBTC No. 17/2000 | Improvement to the Appearance of Slopes |
| WBTC No. 20/2001 | Geotechnical Information Unit |
| WBTC No. 11/2002 | Control of Site Crushers |
| ETWB TC(W) no. 29/2002 Figure 1 | Geotechnical Control for Slopes and Retaining Walls Figure 1 - Boundaries of GEO District Divisions |
| ETWB TC(W) no. 29/2002A | Geotechnical Control for Slopes and Retaining Walls |
| ETWB TC(W) no. 19/2003 Appendix A | Review of Preliminary Design Before Proceeding with the Detailed Design |
| ETWB TC(W) no. 24/2003 | Permanent Reinforced Fill Structures and Slopes |
| ETWB TC(W) no. 28/2003 | Protection of Harbour Area Treatment Scheme Stage I Sewage Tunnels |
| ETWB TC(W) no. 04/2004 | Checking of Foundation Works in the Scheduled Areas of Northwest New Territories and Ma On Shan and the Designated Area of Northshore Lantau |
| ETWB TC(W) no. 16/2004 | The Use of Permanent Prestressed Ground Anchors in Government Projects |
| ETWB TC(W) no. 20/2004 | GEO Checking Certificate for Slopes and Retaining Walls |
| ETWB TC(W) no. 13/2005 | Prescriptive Measures for Stabilisation and Improvement of Man-made Slopes and Standardised Debris-resisting Barriers for Mitigation of Natural Terrain Landslide Hazards |
| ETWB TC(W) No. 15/2005 | Geotechnical Control for Tunnel Works Appendix A - Geotechnical Design Submission for Tunnel Works |
Reference: PNAPs, CoPs, BO and BRs
| ADM-6 or PNAP 79 | Computer Programs for Use in Structural and Geotechnical Design |
| ADM-7 or PNAP 104 | Geotechnical Information Unit |
| APP-15 or PNAP 55 | Site Formation - Temporary or Permanent Filling Work (Appendix A) |
| APP-17 or PNAP 61 | Rock Faces - Building (Planning) Regulations 27 & 47 (Appendix) |
| APP-18 or PNAP 66 | Pile Foundations |
| APP-22 or PNAP 74 | Dewatering in Foundation and Basement Excavation Works |
| APP-25 or PNAP 78 | Requirements for a Geotechnical Assessment at General Building Plan Stage - Building (Administration) Regulation 8(1)(ba) |
| APP-28 or PNAP 83 | Requirements for Qualified Supervision of Site Formation Works, Excavation Works, Foundation Works on Sloping Ground, and Ground Investigation Works in the Scheduled Areas – Buildings Ordinance Section 17 |
| APP-30 or PNAP 85 | Development in Mid-levels Scheduled Area - Buildings Ordinance section 2(1), Building (Administration) Regulation 8(1)(bb)(vii) and 8(1)(1) |
| APP-49 or PNAP 132 | Site Investigation and Ground Investigation |
| APP-51 or PNAP 137 | Monitoring and Maintenance of Horizontal Drains (Appendix A) |
| APP-54 or PNAP 142 | Retaining Walls - Building (Construction) Regulations 1992 - Part XIII (Appendix A) |
| APP-57 or PNAP 148 | Requirements for an Excavation and Lateral Support Plan - Building (Administration) Regulation 8(1)(bc) |
| APP-61 or PNAP 161 | Development in the Areas Numbers 2 & 4 of Scheduled Areas |
| APP-72 or PNAP 178 | Control of Blasting |
| APP-76 or PNAP 183 | Keeping Buried Services out of Slopes |
| APP-79 or PNAP 189 | GEOGUIDE 5 - Guide to Slope Maintenance |
| APP-88 or PNAP 205 | Code of Practice on Inspection and Maintenance of Water Carrying Services Affecting Slopes |
| APP-109 or PNAP 234 | Geotechnical Manual for Slopes Guidance on Interpretation and Updating |
| APP-115 or PNAP 246 | Performance Review – Item 6(g)(ii) in Column B, Section 17(1) of the Buildings Ordinance |
| APP-128 or PNAP 274 | Geotechnical Design Information |
| APP-135 or PNAP 284 | Quality Supervision of Soil Nailing Works |
| APP-137 or PNAP 289 | Ground-borne Vibrations Arising from Pile Driving and Similar Operations |
| APP-140 or PNAP 293 | Registration of Authorized Persons and Registered Structural Engineers as Registered Geotechnical Engineers |
| APP-141 or PNAP 294 | Division of Responsibilities between Authorized Person, Registered Structural Engineer and Registered Geotechnical Engineer |
| ADV-8 or PNAP 168 | Registration of Slopes and Retaining Walls |
| ADV-23 or PNAP 270 | Improvement of Visual Appearance and Landscape Treatment for Man-made Slopes and Retaining Walls |
| Code of Practice for Site Supervision 2005 | Section 7 - Building works with significant geotechnical content Appendix VII - Qualifications of Competent Person (Logging) and TCPs (GIFW) Appendix VIII - Key Records on Quality Supervision of Soil Nailing Works |
| Technical Memorandum for Supervision Plans 2005 | Table 1 - Minimum supervision requirements for different types of building works or street works |
GEO Technical Guidance Notes
| TGN1 | Technical Guidance Documents |
| TGN2 | Technical Recommendations Arising from Lessons Learnt from Landslides in 1997 and 1998 |
| TGN3 | Use of Downhole Geophysical Investigation Methods in Identification of Weak Layers in the Ground |
| TGN4 | Guidelines on Recognition of Geological Features Hosting, and Associated with, Silt- and Clay-rich Layers Affecting the Stability of Cut Slopes in Volcanic and Granitic Rocks |
| TGN5 | Geoguide 2-Guide to Site Investigation Updated Appendix B: Sources of Information |
| TGN6 | Application of Back Analysis Approach to the Design of Slope Preventive or Remedial Works |
| TGN7 | Fill Slope Recompaction - Investigation, Design and Construction Considerations |
| TGN8 | Maintenance Requirements for Natural Terrain Hazard Mitigation Measures |
| TGN9 | Updating of GEO Report No. 56: Application of Prescriptive Measures to Slopes and Retaining Walls |
| TGN10 | Enhancement of Rock Slope Engineering Practice Based on Findings of Landslide Studies |
| TGN11 | Enhancing the Reliability and Robustness of Engineered Soil Cut Slopes |
| TGN12 | The Designated Area of Northshore Lantau |
| TGN13 | Guidelines on the Use of Prescriptive Measures for Rock Cut Slopes |
| TGN14 | Technical Recommendations for Enhancing the Independent Check of Design and Construction Review of Rock Slope Excavation |
| TGN15 | Guidelines for Classification of Consequence-to-Life Category for Slope Features |
| TGN16 | Recommendations Arising from Review of Notable Landslide Incidents During Slope Works (1981 - 2002) |
| TGN17 | Prescriptive Soil Nail Design for Concrete and Masonry Retaining Walls |
| TGN18 | Acceptance of Methods for Quality Control |
| TGN19 | Installation of Soil Nails and Control of Grouting |
| TGN20 | Updating of GEO Publication No. 1/2000 - Technical Guidelines on Landscape Treatment and Bio-engineering for Man-made Slopes and Retaining Walls |
| TGN21 | Design of Soil Nail Heads |
| TGN22 | Guidelines on Geomorphological Mapping for Natural Terrain Hazard Studies |
| TGN23 | Good Practice in Design of Steel Soil Nails for Soil Cut Slopes |
| TGN24 | Site Investigation for Tunnel Works |
| TGN25 | Geotechnical Risk Management for Tunnel Works |
| TGN26 | Supplementary Guidelines for Foundation Design in Areas Underlain by Marble and Marble-bearing Rocks |
| TGN27 | Hydraulic Design of Stepped Channels on Slopes |
(Selected)
| CEDD TC No. 21/2004 | Standard Clauses in Consultancy Briefs for Provision of Deliverables in Digital Format |
| CEDD TC No. 26/2004 | Contingency Plan and Risk Assessment |
| CEDD TC No. 29/2004 (ETWB TC(W) No. 19/2003) | Review of Preliminary Design prior to Proceeding with Detailed Design |
| CEDD TC No. 04/2008 | Public Works Subcommittee Submission |
| CEDD TC No. 04/2009 (ETWB TC(W) No. 29/2002) | Project Initiation and Technical Feasibility Statement (TFS) |
| CEDD TC No. 06/2009 | Monitoring of Public Works Programme (PWP) |
(Selected in TGN1)
| GCO Publication No. 1/90 | Review of Design Methods for Excavations |
| GEO Publication No. 1/93 | Review of Granular and Geotextile Filters |
| GEO Publication No. 1/2000 | Technical Guidelines on Landscape Treatment and Bio-engineering for Man-made Slopes and Retaining Walls |
| GEO Publication No. 1/2006 | Foundation Design and Construction |
| GEO Publication No. 1/2007 | Engineering Geological Practice in Hong Kong |
| GEO Publication No. 1/2009 | Prescriptive Measures for Man-made Slopes and Retaining Walls |
| Geoguide 2 | Guidance on the determination of the location and spacing of the points of exploration is given in Chapter 10 of Geoguide 2 |
(Selected)
| GEO Report No. 15 | Assessment of Stability of Slopes Subjected to Blasting Vibration |
| GEO Report No. 29 | Classification and Zoning of Marble Sites |
| GEO Report No. 56 | Application of Prescriptive Measures to Slopes and Retaining Walls |
| GEO Report No. 75 | Landslides and Boulder Falls from Natural Terrain: Interim Risk Guidelines |
| GEO Report No. 104 | Review of Natural Landslide Debris-Resisting Barrier Design |
| GEO Report No. 136 | Guidelines on Safe Access for Slope Maintenance |
| GEO Report No. 138 | Guidelines for Natural Terrain Hazard Studies |
| GEO Report No. 182 | Use of Standardised Debris-resisting Barriers for Mitigation of Natural Terrain Landslide Hazards |
Oversea reference: