2009年7月30日 星期四

Cost estimation

Extracted from HKIS's seminar 2005
http://www.hkis.org.hk/hkis/html_jo/upload/HomeHeadline/hhlnk174_0.ppt
A. Preliminary cost estimate (CFA x unit rate $/CFA)
B. Elemental cost estimate (Sum of elemental quantity x unit rate)
C. Cost plan (Sum of approximate quantity x unit rate)
D. Pre-tender cost estimate (bases on B.Q. & current price e.g. recent returned tender, quotation etc.)

2009年7月28日 星期二

Limitation Ordinance《時效條例》第347章

A. 逆權管有 (Adverse possession)
B. 合約及侵權行為訴訟 (Limitation of action of contract and tort) C. 追討租金的訴訟 (Limitation of action to recover rent)


A. 逆權管有 (Adverse possession)
第7條 及 第17條
(1)  當政府物業被佔用人逆權佔有長達六十年,政府便不能討回物業。

(2) 若私人物業在一九九一年七月一日前開始已失去管有權,被逆權佔有二十年後,又或物業在一九九一年七月一日後開始失去管有權,被逆權佔有十二年後,合法業主便不能討回物業。
逆權侵佔需要合乎「敵意佔有」(hostile) 之要素。
現時法改會正進行研究: http://www.hkreform.gov.hk/tc/projects/adv_possess.htm

相關案件:

1. 利舞臺寮屋住戶 上訴失敗 [2008] HCMP1828/08
2. 一對母女持續佔用大埔一幅萬呎農地超過20年,高院裁定二人得到該地段業權HCA477/2000。恆基地產不服,上訴 FACV 21/2005
3. 因為只是聲稱無法聯絡註冊業主,在沒有付租下佔用元朗洪水穚一址,但因為他在交付法院的誓章中表示有付租的意願,所以其佔據的意圖不成立,「逆權侵佔」亦不能成立。Wong Tak Yue v. Kung Kwok Wai David and Another [1998], FACV1/1997.
4. A squatter grants a tenancy and receives rent over 30 years after that he was unauthorised to occupy for 7 years. The Court unanimously agreed that the squatter was in adverse possession of the land through his tenant and obtained possessory title. see Cheung Yat Fuk v. Tang Tak Hong and others [2004] HKCFA 35
5. Owners have the right to jointly possess and use the common areas - The Incorporated Owners of Chungking Mansions v Shamdasani [1991] 2 HKC 342.
6. In case of Incorporated Owners of Homantin Mansion v Power Rich Investment Limited and the Occupier (LT Case No.BM41 of 1996) questions whether rights by way of adverse possession can be acquired in multi-storey developments where owners have unity of possession. There was no decision on the point since the matter was referred to the High Court [now the Court of First Instance] and we await judgment on this issue.


B. 合約及侵權行為訴訟 (Limitation of action of contract and tort)
第4條及 第31條
(1) 合約(Contract)訴訟 s.4: 簡單合約由產生的日期起計滿6年後不得提出訴訟。蓋印合約 (contract under seal) 由產生的日期起計滿12年後提出不得提出訴訟。
(2) 侵權行為包括疏忽(Tort including negligence)訴訟 s.31: 由產生的日期起計滿6年後不得提出訴訟;或由知悉日期起計3年,如在產生的日期起計滿6年後。
相關案件:
1. The plaintiff bank's cause of action in negligence against the architects and the specialist cladding subcontractors did not accrue until the bank suffered relevant damage. Analysis made by Litton PJ of the evidence and his conclusions as to when the physical damage first occurred. The Bank of East Asia, Ltd. v. Tsien Wui Marble Factory Ltd. and Others and Remo Riva and Others (Third Parties) - [1999] HKCFA 6; [1999] 2 HKCFAR 349; [2000] 1 HKLRD 268; [2000] 1 HKC 1; FACV000021/1998, 10 December 1999
2. King v Victor Parsons [1973] 1 WLR 39 related to s.26

C. 追討租金的訴訟 (Limitation of action to recover rent)
第18條: 在欠繳租金到期應繳的日期起計滿6年後。

2009年7月21日 星期二

Fire safety engineering of structures

DRAFT
Introduction
The relevant Building Fire Safety Regulations and Procedures in Hong Kong may be referred to HKU website: http://www.arch.hku.hk/teaching/firesafety.html.
The fire resistance period (FRP) in HK is specified in Section 6 and Table 2 of Code of Practice of Fire Resisting Construction 1996 (FRC).
A number of different approaches to ensure fire safety, which includes:
·        A prescriptive approach (deemed-to-satisfy rules)
·        A performance based approach to address a particular part of the design with the rest of the design following a prescriptive based approach
·        A full performance based approach


(a) Prescriptive method defines a structural fire design fairly in terms of the materials used, shape and size of structural elements, thickness of fire protection materials and construction details etc.
PNAP 192FRC table A to F: Fire resisting material.
PNAP 195 & MOE: Provision of means of escape
CoP FSI: Fire service installation of equipment
PNAP 87 & BO 21(6)(d): Permanent Water Supply to Fire Service Installations
PNAP 182, MOA & B(P) 41, 41A, 41B, 41C & 41D: Means of Access for Firefighting and Rescue in Buildings
PNAP 202: Application of fire safety codes
PNAP 212 & Fire Safety (Commercial Premises) Ordinance: Prescribed commercial premises when floor area exceeds 230m². 
PNAP 302 & Fire Safety (Buildings) Ordinance: For composite building or domestic building



 
Concrete

Three methods for design of concrete for fire resistance:
A. Tabulated data
B. Fire test
C. Fire calculation


A. Tabulated data
Control of cover, finish and minimum dimension of elements:
(i) For BS8110-2, estimation of concrete cover:-
C ave = (A1C1 + A2C2 + ...) / (A1 + A2 +...)
where A1, A2,... = Area of reinforcement; C1,C2,... = Cover / distance from heated faces
(ii) In FRC 1996, consideration of design of fire resisting elements: -
Column/beam - exposure condition, steel ratio and minimum dimension (table E);
Steel column/beam - concrete cover, finish or gypsum board (table D)
Slab/stair - minimum dimension and concrete cover (table C & F)
Wall - Steel ratio & cover (table A) and finish (table B)
(iii) Applied finish for additional protection. i.e. gypum or gypum plaster board (Table B & D of FRC)
(iv)  Additional requirement for high strength concrete of grade greather than 60D according to s4.3 of CoP of Concrete 2004. The Buildings Department may impose the following conditions in approval letter
B. Fire test
(i) A quality assurance proposal is to be submitted with sufficient preliminary test results to confirm that reliable and consistent concrete can be produced. This should include a detailed assessment of the concreting materials, the mix design and the quality control procedures of the batching plant. In this respect the designed mean resistance to crushing shall initially exceed the specified resistance to crushing by a margin of not less than 12 MPa.
(ii) Adequate facilities are to be provided on site, for sampling the fresh concrete, making, curing and storing the test cubes.
(iii) An experienced and competent person is to be provided full time to supervise the whole work so as to ensure compliance with the approved plans.
(iv) All concrete arriving onsite shall come from a concrete supplier registered under the Quality Scheme for the Production and Supply of Concrete (QSPSC).
(v) Sampling of fresh concrete, making, curing, storing and compression testing of concrete test cubes should be carried out in accordance with the methods specified in CS 1:1990 by a laboratory accredited under HOKLAS for the particular test concerned. Both sampling and test results should be reported on a HOKLAS Endorsed Certificate and submitted within 21 days after sampling and/or testing.
(vi) At least one sample of concrete shall be taken from every ready mixed vehicle arriving on site. If concrete is site batched one sample shall be taken from every 10m3 of concrete produced.
(vii) Insitu core testing to the completed structure shall be carried out. Tests for compressive strength of concrete cores should be carried out in accordance with the method specified in CS1: 1990, by a laboratory accredited under HOKLAS for the particular test concerned. Test results should be reported on a HOKLAS Endorsed Certificate and submitted within 21 days after testing.
(viii) Qualified site supervision of the drilling of concrete core samples, by an experienced and competent person, should be provided. The person supervising the drilling of core samples should be indepedent from the contractor.
(ix) Details of any subsequent revision of the mix design are to be submitted.
(x) Consent to commence the work will not be granted until the following documents have been submitted and found satisfactory.
·        the quality assurance proposal and confirmation of the mix proportion to be adopted;
·        proposals for the onsite facilities for sampling of fresh concrete and making, curing and storing the test cubes;
·        the name of the laboratory accredited under HOKLAS, which will carry out the onsite and laboratory sampling and testing work;
·        the name and professional details of the person who is to supervise the works on a full time basis; and
·        proposal for insitu core testing of the finished concrete structure.

2009年7月18日 星期六

Technology for Sustainable Development



I. Cooling and heating systems
a. Geothermal
Development in UK (by ICE)
Energy pile: (European Experience) (similar to closed loop system)
  • Possible extraction values for heat exchangers is between 20 W/m and 100 W/m subject to underground situation an operation hours;
  • For the borehole heat exchanger it should be between 100 and 150 kWh / (m*a)
  • Return on investment of such systems is around 8 – 12 years comparsion with oil heating systems
  • Thermal properties: Thermal conductivity is the capacity of a material to conduct or transmit heat; Thermal diffusivity describes the rate at which heat is conducted through a medium. It is related to thermal conductivity, specific heat and density.
                           

Site Conditions - Initial  consideration
Geothermal International (Skanska)TM
Wetland Park is one of few examples in Hong Kong. There is adopted geothermal heat pump air-conditioning system (GHP A/C) with a total cooling capacity of 2500kW. The GHP A/C system consists of a ground-coupled heat-pump air-conditioning unit, vertical geothermal closed-loop heat exchanger, and aqua-thermal closed-loop heat exchanger. The geothermal heat exchanger is formed by 468 pairs of 32mm diameter vertical high-density polyethylene pipes, each pipe being 50m in length. As a result, 25% of energy is saved according to news.gov.hk.
地熱熱泵 ( 地換熱系統 ) (EMSD)
國內節能環保型地源泵空調系統
b. Water-cooled air conditioning system
(i) Cooling tower: energy saving up to 20% compared with conventional air-cooled system. A pilot scheme was launched by EMSD since 2000. However, safety measures for Prevention of Legionnaire’s Disease is concerned.
(ii) Central sea water: see brief by HKU or EMSD
(iii) District Cooling Scheme (DCS): similar (ii) enables energy saving up to 35%.
Studies by EMSD, Water-cooled Air Conditioning Systems, Publications
c. Natural ventilation
e.g. Solar passive design
The basic natural processes that are used in passive solar energy are the thermal energy flows associated with radiation, conduction, and natural convection. When sunlight strikes a building, the building materials can reflect, transmit, or absorb the solar radiation. Up to date, well developed in passive heating but less developed in passive cooling (by Sustainable Sources).
                                     
Summer Venting Sunroom

                            Figure 1: Summer Venting Sunroom for cooling building
                                    
Summer Venting Thermal Mass Wall

                             Figure 2: Summer Venting Thermal Mass Wall
(Source: http://passivesolar.sustainablesources.com/. This website also show other passive systems)
Useful link: Climatic Design of Buildings in HK, HKU

II. Renewable energy
a. Solar photovoltaic (PV) panels: This technology converts solar energy into electricity and either stores it in batteries, transmits it into the electricity conveyance grid, or uses it directly. The panels are made of crystalline or amorphous silica materials. Three common types are avaliable:-
Photovoltaic typeMono-crystallinePoly-crystalline siliconAmorphous silicon
AdvantagesHigh efficiencies (14%-16%)Cheaper than mono-crystalline- Cheaper than crystalline cells
- Can use curved surface
DisadvantagesComplicated and expensiveLess efficient than mono-crystalline around 13%-15%Less efficient than crystalline around 5%-7%

Output: 1000W/m² under irradiance level with air mass of 1.5 or temperature at 25°C. In HK, the annual power output for cyrstalline modules to be installed from horizontal to tilting angle is 22° toward South is around 120kWh/m². Annual output could reduce to be around 70kWh/m². Expected lifetime for maintenance is 20 years.
Details see EMSD's leaflet.
b. 酒精「零污染」發電
http://www.takungpao.com/news/08/03/28/JX-883836.htm
III. Daylighting and illumination systems
a. Natural daylighting; e.g. sidelighting (lightling reflector), toplighting, light tube/pipe and lighting diffusion.
Example projects in HK: see HKEE Net website
b. Luminaire/ Lamp (source: HKEE Net & Energy Land by ESMD)
(i) Compact fluorescent lamp (CFL): 4 times more efficient and last up 16 times longer than incandescent.
(ii) Induction lump: Electrodeless lamp with high frequency. It is is based on the principles of induction and light generation via a gas discharge. The life can reach 60,000 hours longer than fluorescent lamps (between 5,000 to 15,000 hours). The luminous efficacy is ranged from 48 to 80 lm/W and can up to 24% compared with high intensity discharge (HID) lamps
(iii) Light Emitting Diode (LED): A semiconductor diode supported by a reflector and encapsulated with an epoxy lens for controlling light distribution. The luminous efficacy is ranged from about 12 to 55 lumen/W, depending on the lamp colour. When compared with fluorescent tubes, LEDs is less efficacy (fluorescent tubes have luminous efficacy from 50 to 90 lumen/W). In 2008, the LED efficacy is up to 115 to 150 lm/W. (See http://en.wikipedia.org/wiki/Light-emitting_diode)
                                      
image

(iv) T5 fluorescent tube: diameter of 16 mm (5/8"). Luminous efficacy is about 100 lm/W more efficient than the T8 or T12 lamps (70 lm/W and 80 lm/W respectively). If taking into account the high frequency operation and reduced power loss due to the use of electronic ballast, 20 - 30% of energy reduction.
Example project, see ESMD website: Report of the Pilot High Output ‘T5’ Fluorescent Lighting Project at East Kai Tak Indoor Games Hall
c. Other daylighting systems see http://www.arch.hku.hk/~kpcheung/daylight/dayindex.htm
IV. Green Roof Research
HKU Greenroof research http://www.hku.hk/bse/greenroof/
Study on Green Roof Application in Hong Kong Final Executive Summary by ASD
Study on Green Roof Application in Hong Kong Final Report by ASD
Knowledge about tree planting, Development Bureau
CM Hui (HKU) http://web.hku.hk/~cmhui/present.htm
V. Case study
 ICE/RICS Lecture notes
Study 1 : Skyhouse
Renewable energy
1. Wind turbines
2. Photo-voltaic panels at South
3. Wind permeable structures
Sustainable feature
1. Green roof

Study 2 Wetland
Wetland Park
The Park includes an indoor exhibition hall of 10,000 square meters, concealed under a grass slope. The environmentally sustainable design concepts adopted include:
Sustainable Planning
- Minimum footprint to maximize open space
- Building disposition taken into consideration of the sun path to avoid solar heat
Ecological Impact
- Retaining existing site characteristics
- Retaining existing vegetations
Energy Conservation
- Upgrading building services to improve energy efficiency, including the application of geothermal system
- Overall Thermal Transfer Value is between 3.8watts/m2 to 16.9watts/m2
- Timber screens at appropriate locations to shading off direct sunlight
- Special galleries and lecture room to promote green concepts
Visual Impact
- Building composition is integrated with surroundings
- Exterior wall and colors are in-line with surrounding buildings
Environmental Health & Hygiene
- Toilets are provided with natural light and with stand-by mechanical means
- No A/C is provided for satellite building and bird hides
Daylight, Illumination & Visual Access
- Front portal, atrium and toilets are provided with natural ventilation
- Timber louvers can diffuse direct sunlight
Water Conservation
- Water in artificial lakes is naturally treated
- Water conservation cistern is only 6 liter in consumption
Construction Waste Management
- Stone slabs recycled as pavers to save construction waste
- Formwork recycled is modified as temporary fence
Materials Use & Specification
- PFA was used in concrete mix
- Bricks recycled and with local pavers to reduce overseas procurement
- Oyster shells recycled to promote environmental initiative
Functionality
- The phase 1 building can be converted into an anteroom
Other ASD's projects see http://www.archsd.gov.hk/english/reports/e3118.pdf
VI. Policy
1. International Emission Trading clause in Article 17 is now implemented in EU & UK, see Wikipedia.
2. 中華人民共和國節能能源法
3. 國家環境保護總局建設項目環境影響評價文件審批程式規定
4. China Environmental Law blog
5. Rating schemes for green buildings in elsawhere
VII. Good Practices in HK
1. Building Energy Codes (BEC) - EMSD
2. Hong Kong Energy Efficiency Registration Scheme for Buildings (HKEERSB) - EMSD
3.  Life Cycle Energy Analysis of Building Construction - EMSD
4. Indoor Air Quality Certification Scheme for Offices and Public Places - EPD
5.  Building Environmental Assessment Method (BEAM) - HKBEAM
6. Sustainable Design For Building - ASD

2009年7月6日 星期一

CFA & GFA

Construction Floor Area (CFA) generally covers areas of a building that are to be constructed and are measured to the outside face of the external walls of the building and includes all lift shafts, stairwells, car park, plant rooms and the like. CFA is generally measured by QS for the purpose of estimation of the construction costs of a building
Gross Floor Area (GFA) (as defined under the Building (Planning) Regulation 23(3)(a)) is the area contained within the outer surface of external walls of a building measured at each floor level. GFA is generally measured by Architect for the purpose of building submission and referred in plot ratio (B(P) s18A - site classification, B(P) s19 - general provisions and 1st Schedule of B(P)R refers).
GFA =  Site area x Plot ratio B(P)R s21 subject to site classification, also limited by permission in OZP and lease.
Site coverage B(P)R s20
For example, if the site area is 10,000 sq.m., site coverage is 50% and plot ratio is 10, it allows a 20 story building with 5,000 gross floor (“gfa”) area per floor.
GFA Concessions via "disregarded GFA" (covered under section 23(3)(b)/23A of the B(P)R), "exempted GFA" (covered under section 42 of the BO) and "bonus GFA" (covered under section 22 of the B(P)R).
 


(Extracted from http://www.news.gov.hk/)
Apart from the B(P)R, exemption of GFA or modification to Building Plan are as follows:
Buildings Ordinance
BO s31(1)
  To permit the following to project over a street:    

(a)     Window flower box

·     not projecting more than 500mm over street;
·     not having a width exceeding the width of the window opening;
·     the base is well above the floor level;
·     provided as amenity to domestic units;
·     designed so as not to drip water onto the street.
    Air-conditioning hood and platform
·     width is justified;
·     min. height is 2.5m above ground level;
·     drainage system for disposal of water generated from the A/C plant provided.
(b)     cladding walling provided for refurbishment of existing building subject to minimal projection is consistent with the fixing method used (but not more than 300 mm) and no resultant gain in floor area ;
(c)     transformer room door heads which do not fall within the criteria under B(P)R7, provided that no obstruction is caused to vehicular or pedestrian traffic ;
(d)     pedestrian bridges and other buildings required under the lease conditions, subject to compliance with the requirements of all interested departments (except in relation to any claims for GFA exemption or concession) ;
(e)     canopies not strictly in accordance with B(P)Rs Part II, subject to compliance with the requirements of all interested departments and that the canopy can serve its function of weather protection for pedestrians and subject to the width of the canopy not exceeding 3 m nor extending beyond the edge of the pavement ;
(f) architectural features to enhance genuinely the appearance of buildings provided they are not excessive and comply with the spirit of PNAPs 68 & 116 ;
(g)     installation of sheet piles under street subject to no adverse comments from Lands Dept, Highways Dept; Transport Dept. and other interested government departments and requirements, if any, from the above departments are compiled with.
Building (Administration) Regulations
B(A)R 14(3)
    To permit one set of submitted plans to be uncoloured
B(A)R 29(1A)
    To exempt plans submitted by charitable organizations from payment of fees for processing, subject to the building works being wholly for and directly associated with the charitable purpose.
    To exempt plans from payment of fees for processing of A&A proposals for upgrading/improving building or fire safety.
B(A)R 33(1)
    To permit exemption from obtaining prior approval and consent for amendments to building/drainage works for which the first consent has been given, on the condition that such amendments comply with criteria set out in PNAP 272 .

Building (Construction) Regulations

B(C)R 35
    To permit the level of an internal floor to be less than 150mm above the level of the external ground subject to compliance with the criteria for exemption laid down in PNAP 266.
B(C)R 49(1)   
    To permit the level of an usable floor area to be less than 150mm above the level of the adjoining flat roof subject to compliance with the criteria for exemption laid down in PNAP 266.
Building (Planning) Regulations
B(P)R 20 and/or 21
(a)     To permit existing party walls, common staircases and other party structures retained to be excluded from site coverage and plot ratio calculations, provided they are physically separated from the proposed new building at that particular floor level and no intervening space has any potential for infilling .
(b)     To permit the site coverage to exceed the limits laid down in the 1st Schedule of B(P)R, provided the increase is for the purpose of upgrading the fire safety installation in existing buildings .
 (c)     To permit genuine green and innovative features under JPNs to be excluded from site coverage calculations if the criteria set out in JPNs are complied with .
  (Note: exemption from GFA calculation will be made under B(P)R 23(3)(a))
B(P)R 22(1)
    To grant bonus PR & SC in line with B(P)R 22(1) in return for corner splay not exceeding 4m x 4m with a height clearance not less than 3.3 m required by TD or HyD subject to compliance with the conditions specified by TD or HyD.
B(P)R 23(2)(a)
    To permit the existing private service lanes to be included in site area provided that the lane is not specifically required under B(P)R 28 and is not built in, over, upon or under.
B(P)R 23(3)(a)
(a)     To permit the exclusion of voids from GFA calculations where they appear at intermediate floor levels in the following cases:
(i) in cinemas, theatres, auditoria, school halls, sporting halls and auditoria of religious institutions, in front of galleries;
(ii)      in banking halls, outside mezzanine floors;
(iii)     in shopping arcades, in atria or around escalators;
(iv)    in bona fide hotels, club houses and commercial buildings, in prestigious main entrance halls over one storey high; and
(v)     void over prestigious main common entrance hall of domestic building;
(vi)    in front of cocklofts over ground floor shops, for single staircase buildings, subject to the cocklofts satisfying the following criteria:
(1)     they are constructed over ground floor shops, forming an integral part and within the curtilage of the ground storey;
(2)     they are used only as storage for the shops;
(3)     there is no sanitary provision in the cocklofts;
(4)     they are not at the same level as any adjacent staircase landing;
(5)     they are only accessible through the G/F shop;
(6)     a minimum clearance of 1.5 m is maintained across the front; 
(7)     all openings in the cockloft floor must be without full height enclosure but are defended with protective barriers not less than 1.1 m high; and
(8)     only one such cockloft is situated in any one shop.
In all such cases CBS should satisfy themselves that any subsequent conversion resulting in excess plot ratio is unlikely.
 Where there are no intermediate floors, high storey heights may be accepted where required by the intended use, as in squash and badminton courts and purpose designed factories with an identifiable client interest.
(b)     To permit suitably designed covered landscaped and play areas under the footprint of the domestic towers to be excluded from GFA calculations where there is no likelihood of abuse and that such areas do not exceed 5% of the total domestic GFA.
(c)     To permit filtration plant rooms for swimming pools to be excluded from GFA calculations subject to reasonable size (width of space between the plants and the wall of the room is less than 1.5 m) and installation of plants before OP application .
(d)     To permit the exclusion of recreational facilities referred to in PNAP 229 from GFA calculation.
(e)     To permit the exclusion of horizontal screens referred to in PNAP 116, covered walkways and similar passageways provided for the convenience of occupants from GFA calculations subject to the width of such screen, walkway or passageway not exceeding 2 m wide.
(f) To permit miniature logistic service room to be excluded from GFA calculation subject to:
l     not excessive in size and size not exceeding 8m2 for a block size of 240 flats
l     the room is located in the common area adjacent to the management office or guard post
(g)     To permit counters, offices, stores, guard rooms, and lavatories for watchman and management staff to be excluded from GFA calculation subject to:
·     not excessive in size and size not exceeding 5 m2 for every 50 flats per every block or for each block;
·     facilities are located in a common area or designated as common area in a Deed of Mutual Covenant.
(h)     To permit mail room not exceeding 60 m2 in commercial and industrial buildings to be excluded from GFA calculation subject to:
·     not excessive in size
·     endorsed by Postmaster General
·     located in common area or designated as common area in a Deed of Mutual Covenant
·     building is centrally managed
(i) To permit refuge floors, which are required under the MOE Code, to be excluded from GFA calculations subject to the floor be suitably designed to comply with the FRC code .
(j) To permit lift shaft areas in domestic and composite buildings over and above 2.5% of the total (domestic) GFA to be excluded from (domestic) GFA calculation subject to:
·     the total areas to be excluded not to exceed 3.5% of the total (domestic) GFA; and
·     the criteria for exemption laid down in PNAP 207 are complied with.
(k)     To permit genuine green and innovative features under JPNs to be excluded from plot ratio calculations if the criteria set out in JPNs are complied with.
B(P)R 25(1)(a)
    (a)     To permit a portion of a service lane to count as open space as provided for by B(P)R 28(3) for lanes not required under B(P)R 28(1) ; and
    (b)     To exempt bona fide hotel developments from the provision of open space .
B(P)R 27
 To permit the intervening space between a cutting, including a toe wall supporting a cutting to be less than that specified in B(P)R 27 provided GEO raises no objection.
B(P)R 30
    To permit the omission, or reduction in standard, of natural lighting and ventilation in the following cases :
(a)     an ancillary office which does not exceed 30% of the GFA of the premises within which it is located (this is particularly relevant to small 'offices' associated with industrial premises);
(b)    shroff office serving commercial carparks;
(c)     management office and owners’ corporation/owners’ committee office;
(d)    temporary sales office and show flat;
(e)     kitchens in licensed premises; and
(f) in purpose-designed office buildings subject to the following principles and criteria:
(i) there should be recognizable reasons (structural, aesthetic, planning constraints, etc.) why the full standards required by the regulation cannot readily be met;
(ii)     the building should be of such a type, in terms of location, status, and size, that would lead to the inference that (except in times of emergency) office workers would normally be in an artificially boosted and controlled environment;
(iii)    plans should clearly show provisions for a central air‑conditioning installation to serve the whole building;
(iv)    most of the whole building, and most of each floor or occupancy unit, should have a reasonable provision of natural lighting and ventilation capable of ensuring that most of the premises can remain suitable for occupation even if the means for producing the artificial environment temporarily fail;
(v)     the Form BA 16 applications should indicate clearly in paragraph 2 what minimum standards of artificial lighting and/or mechanical ventilation are proposed to be maintained if the modification is given;
(vi)    the design of the building should not easily lend itself to division into a large number of separate units capable of occupation without any central management organization; and
(vii)   the plans should clearly quantify the deficiency proposed, expressed as a percentage of the regulation requirements.
Where the omission or reduction of natural ventilation is permitted, it shall be subject to:-
·    the submission of an assessment report confirming that mechanical means of ventilation to be provided in the building is capable of supplying fresh air at the rates stipulated in Annex 1 of PNAP 30.·    Plans and sections marking clearly the locations of the proposed fresh air intake to indicate the compliance of the requirements set out in Annex 2 of PNAP 30.
    For accommodation listed in (b), (c) and (d), fresh air supply requirement should be the same as that for ancillary offices set out in Annex 1 & 2 of PNAP 30.  Dual purpose industrial/office user premises, and industrial premises converted to office user, will be regarded as office user for the purposes of compliance with lighting and ventilation requirements.  For the avoidance of doubt these categories of premises are not 'purpose-designed office buildings'.
B(P)R 30(2)(a)(ii)
    In 'curtain wall' situations, in respect of ventilation only, to permit the area of openable windows to be as low as 1% of the floor area in commercial buildings, on the following conditions :
(a)    that the provision of openable sashes is equally distributed around the facade;
(b)     that an assessment report is submitted to confirm that mechanical means of ventilation to be provided in the building is capable of supplying fresh air at the rates stipulated in Annex 1of PNAP 30;
(c)   that plans and sections marking clearly the locations of the proposed fresh air intake is provided to indicate the compliance of the requirements set out in Annex 2 of PNAP 30; and
(d)     that the accommodation is designed so that all units are capable of receiving natural ventilation in the event of failure of the mechanical system.
B(P)R 31(1)(c) & (d)
(a)     To accept the layout of prescribed windows for the habitable rooms/kitchens of domestic flats with deficiency in horizontal plane provided that:
·     the “prescribed” windows facing wide permanent open space; and
·     it is satisfied that the standards of lighting and ventilation would not be prejudiced.
(b)    To accept the layout of prescribed windows for office or habitation with deficiency in horizontal plane provided that:
·     the room is provided with a window facing a RHP complying with the minimum dimensions stipulated in B(P)R 31(2);
·     the RHP has a longitudinal dimension of not less than 30m; and
·     there is ample open space for free flow of air with a minimum clear distance between buildings not less than 4.5m wide.
B(P)R 35A
    To accept non-provision of gas aperture in the following:
·   bathroom in domestic premises subject to the provision of shared hot water heater with other room and the hot water pipe from the said water heater is not greater than 12 m as required by Waterworks Regulation 19; and
·   shower room for recreational facilities subject to the provision of electric water heaters installed prior to OP application .
B(P)R 36
    To permit the omission or reduction, of natural lighting and ventilation to rooms containing soil or waste fitments in the following cases, provided good management is available :
    (a)     internal bathrooms in bona fide hotels;
    (b)     toilets/changing rooms in licensed premises and recreational facilities;
    (c)     in basements;
    (d)     in non-domestic buildings;
    Such modifications must be conditional upon:
·    The submission of an assessment report confirming that mechanical means of ventilation to be provided in the building is capable of supplying fresh air at the rates stipulated in Annex 1 of PNAP 30.
·    Compliance with the requirements set out in Annex 2 of PNAP 30 for t he fresh air intake.
·    The submission of plans and sections marking clearly the locations of the proposed fresh air intake shall be submitted except for a central AC system for B(P)R 36.
(e)     Bathrooms in domestic buildings subject to compliance with the criteria for exemption laid down in PNAP 219.
B(P)R 40
    To permit the omission of natural lighting to staircases provided proper management is expected (para.4 of PNAP 169 is relevant) subject to the provision of a permanent artificial lighting system with 30 lux min. lighting level backed up by an emergency lighting system providing a horizontal illuminance at floor level of not less than 2 lux.  The design of the emergency lighting system should comply with the Code of Practice for Minimum Fire Service Installations and Equipment .
B(P)R 41B
    To permit the non-provision of fireman's lift in A&A proposal subject to no adverse comment from D of FS .
B(P)R 41D
(a)     To permit the non-provision of turning space at the dead-end of the EVA subject to the F.S. appliances need not to reverse more than 30m for turning.
(b)     To permit the EVA at the run-in/out point to have a width of not less than 4.5m.
(c)     For domestic buildings not more than 3-storey and single family houses to which paragraph 5 of the MOE Code applies:
l     To relax para. 24.2(a) and 25.3(c) of the MOA Code to permit the width of the EVA to be not less than 4.5m
l     To relax the horizontal distance required under para. 24.2(e) and 25.3(c) of the MOA Code to a distance of 30m or more subject to the provision of enhanced FSI, including the provision of a hose reel or sprinkler system, as the case may be, to the satisfaction of FSD
(d)     To relax para. 25.3(c) to permit the width of the existing road serving as EVA for building re-development, other than industrial building, cinema and theatre, to have a width of not less than 4.5m
(e)     To relax para. 25.3(c) to permit the major façade having less than one-fourth of the total perimeter walls when the topographical features of the site make the compliance impractical subject to the following conditions:
l     The major façade served by the EVA shall not be less than the minimum distance between the two opposite side boundaries for Class A site within 10m from the EVA;
l     The requirements of para. 24.2(e) be complied with for Class B and C sites.
B(P)R 47(2)
    To permit the space left between the domestic building and the bottom of the retaining wall to be less than 1.5m wide provided that GEO raises no objection .
Building (Private Streets and Access Roads) Regulations
B(PS&AR)Regs (generally)
    To permit the modification of any regulation, subject to the agreement of and inclusion of any conditions imposed by the traffic authorities (HyD, CEDD and/or TD) .
Building (Refuse Storage and Material Recovery Chambers & Refuse Chutes) Regulations
B(RS&MRC&RC)R 7
    To permit refuse storage and material recovery chambers to have no external wall provided that:
·     there are planning restraints;
·     DFEH is satisfied that a refuse collection vehicle can gain access to the refuse storage and material recovery chamber when so required under B(RS&MRC&C)R 3; and
·     the location of the chamber will unlikely cause noise or sanitary nuisance.
B(RS&MRC&RC)R 10(2)(a)
    To permit doors to refuse storage and material recovery chambers to be situated other than in an external wall, provided that there is sufficient cross ventilation, that there are planning restraints making compliance impractical and that DFEH raises no objection .
B(RS&MRC&RC)R 19(2)(b)
    To permit vent pipes to be carried up to a lesser height in cases where the Hong Kong Airport (Control of Obstructions) Ordinance would otherwise be contravened, subject to their being so located as will not create a nuisance to any nearby occupancy.
B(RS&MRC&RC)R 23(1)
    To permit hoppers installed in industrial premises and markets to have a mouth opening exceeding the regulation maximum, subject to provision of suitable locking or other arrangement to safeguard against unauthorized access.
B(RS&MRC&RC)Regs (generally)
    To permit the modification of any other regulation for which a BC precedent exists in similar circumstances.  In the case of refuse storage and material recovery chambers, this would be subject to the agreement of and any conditions imposed by DFEH.
Building (Standards of Sanitary Fitments, Plumbing, Drainage Works & Latrines) Regulations
B(SSFPDW&L)Rs 5 & 8
    To permit less facilities than those required when recommended by the Licensing Authority.
B(SSFPDW&L)R 19
    To permit the discharge of flushing cisterns of watercloset fitment to be less than 9 litres provided that:
    (a)     the associated toilet bowls are compatible with the cistern;
    (b)    the flushing cisterns shall be the valveless syphonic type; and
    (c)     the syphonic action is sufficient for the wastes in the toilet bowls to be cleared effectively by a single flush.
B(SSFPDW&L)R 24(2)(a)
    To permit the internal diameter of a trap to a soil fitment to be less than 80 mm provided that:
    (a)     the fitment is of syphonic action;
    (b)     the internal trap diameter to be not less than 54 mm; and
    (c)     the fitment is within domestic, office, shop or industrial premises.
B(SSFPDW&L)R 31(1)
    To permit vent pipes to be carried up to a lesser height in cases where the Hong Kong Airport (Control of Obstructions) Ordinance would otherwise be contravened, subject to their being so located as will not create a nuisance to any nearby occupancy.
B(SSFPDW&L)R 48
    To permit drains or sewers to have a lesser fall, on condition that a minimum velocity of 750 mm/sec is achieved.
B(SSFPDW&L)R 50(3)
    To permit the provision of flexible joint for underground drainage pipework in reclaimed land subject to production of satisfactory test report demonstrating that the joint can accommodate the anticipated settlement.  
B(SSFPDW&L)Rs (generally)
    To permit the modification of any other regulation for which an established BC precedent exists in similar circumstances.

Main Reference: